We use our own cookies and third parties ones to offer our services and collect statistical data. If you continue browsing the internet you accept them. More information Accept

Concession on electricity supply in Olot with aerial platform.

05-09-2018

Apply with articulated lifts on truck basket, basket van, electric articulated arms, telescopic, used basket van sale Renault Master, Ford Transit, Iveco with Versalift platform, France Elevateur.

Remember that in order to make your offer you can ask us for customized quotation for hire truck-mounted lifts, Altec, Oil & Steel, Isoli, Socage, Renault Maxity, Nissan Cabstar, Iveco, we also have construction machinery for sale: concrete mixer, Liebherr Excavator, JCB backhoe loader, dump truck, Renault trailer tractor unit, loader loaders, Komatsu mini excavators, Ausa, Genie telescopic platforms, Manitou, Snorkel, sale industrial machinery of all kinds.

Bidding details in Girona:

Supply of electric power for the dependencies, services and premises that are owned and public lighting of the city of Olot

Type of Contract
Supply
publication date
09.05.18
Document Type
Bidding
CPV codes
09310000
Deadline
08.10.18
Procuring Entity
City Council of Olot
Estimated amount
EUR 4,649,101

Description
Electricity supply of the Olot City Council and street lighting in the city of Olot.

Endesa technicians have begun the tasks of dismantling the overhead power line of the old Pletera de l'Estartit (Baix Empordà) urbanization. These tasks represent the last step to make disappear completely the urbanization created in the 80s. Until now, this line was buried by the asphalted part, but at the height of the Camí Fondo it continued in aerial format until crossing the river. It supplied some farmhouses in the area and connected with the part of the right bank of the Gola del Ter. Now, all these customers will receive the supply from an underground line that has been built along the roads that border the Xarxa Natura2000, which protects the space due to its natural interest. The disappearance of the airline has to serve to give more security to the birds there, avoiding the risk of electrocution. The councilor of Medi Ambient of Torroella de Montgrí and l'Estartit, Sandra Bartomeus, emphasizes that this is an "important" step since "the recovery of space has led to a very significant increase in the number of birds that are established or are passing through "

The tasks to eliminate this line together with the construction of the underground part have a cost of 252,000 euros. The technicians began to withdraw it on Wednesday, September 5 and it is expected that in the few weeks it will be over. The initial project, which received a European subvention within the Life project, did not foresee this operation, but thanks to the economic savings accumulated in other works, it has been possible to pay for the removal of the wiring.