We use our own cookies and third parties ones to offer our services and collect statistical data. If you continue browsing the internet you accept them. More information Accept

Work platform lift: regulations of use and UNE standard. ALVE, Report #6

18-03-2019

Alve, camionescesta reports on news related to articulated, electric, telescopic lifts, which we as professionals should have on hand.
According to the UNE-58921: 2017 Standard, you must carry out reviews of each Lift Platform once a year.

Everything you should know about normative lifting platform, standard lifting platform unites.

What is the annual revision of a work platform lift?

The revisions of Lifting Platforms are the periodic, structural, functional and operative checks, of resistance and conservation, to guarantee the maximum performance of the machine in accordance with its conception and manufacture, as well as the safety and health of the people who may be inside. of its field of action.

Who should take responsibility?
- The competent Personnel of the proprietary companies.
- The workshops with the necessary technical capacity for this purpose.
- The official Services of the respective manufacturers brands.
- The duly authorized Inspection or Control Bodies.

What documentation do you need to accredit the Review of a work platform lift?

All verified operations must be marked in the corresponding boxes of the Periodic Review Sheet, including the data of the owner, machine, model, serial number, hours of operation, address and the name and signature of the technician who has made the revision and the date of realization. The results of the operations must be available to the relevant authorities during the entire life of the machine or until the next revision.

Tweets of ‎@ALVELIFT